{"id":1945,"date":"2024-05-08T10:06:46","date_gmt":"2024-05-08T02:06:46","guid":{"rendered":"http:\/\/wmsu.edu.ph\/?page_id=1945"},"modified":"2024-05-08T10:59:10","modified_gmt":"2024-05-08T02:59:10","slug":"bids-and-awards-archive-2021","status":"publish","type":"page","link":"https:\/\/wmsu.edu.ph\/?page_id=1945","title":{"rendered":"Bids and Awards Archive 2021"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Invitations to Bid:<\/h2>\n\n\n\n\n<ul>\n<li>Small Value<\/li>\n\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-12-449%20Supply%20and%20Delivery%20of%20Polo%20Shirt%20with%20Printing%20for%20the%20WESMAARRDEC.pdf\">Supply and Delivery of Polo Shirt with Printing for the WESMAARRDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-12-454%20Supply%20and%20Delivery%20of%20Hotel%20Accommodation%20for%20the%20University%20Board%20Secretary.pdf\">Supply and Delivery of Hotel Accommodation for the University Board Secretary<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-12-455%20Supply%20and%20Delivery%20of%20Food%20Catering%20for%20the%20VPAF.pdf\">Supply and Delivery of Food Catering for the VPAF<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-12-457%20Supply%20and%20Delivery%20of%20Food%20Catering%20for%20the%20OCTA.pdf\">Supply and Delivery of Food Catering for the OCTA<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-410%20Supply%20and%20Delivery%20of%20Coco%20Lumber%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of Coco Lumber for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-410%20Supply%20and%20Delivery%20of%20Coco%20Lumber%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of Coco Lumber for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-433%20Supply%20and%20Delivery%20of%20Various%20Kitchen%20Supplies%20and%20Materials%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Various Kitchen Supplies and Materials for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-12-450%20Supply%20and%20Delivery%20of%20Plaque%20for%20the%20HRMO.pdf\">Supply and Delivery of Plaque for the HRMO<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-411%20Supply%20and%20Delivery%20of%20PVC%20and%20Plastic%20Drum%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of PVC and Plastic Drum for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-375%20Supply%20and%20Delivery%20of%20Chronometer%20Timer%20for%20the%20Administration.pdf\">Supply and Delivery of Chronometer Timer for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-177%20Supply%20and%20Delivery%20of%20Various%20IT%20%20Equipment%20for%20the%20ITSO.pdf\">Supply and Delivery of Various IT Equipment for the ITSO<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-262%20Supply%20and%20Delivery%20of%20DSLR%20Camera%20and%20Digital%20Copier%20for%20the%20WESMAARRDEC.pdf\">Supply and Delivery of DSLR Camera and Digital Copier for the WESMAARRDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-429%20Supply%20and%20Delivery%20of%20Food,%20Venue%20&amp;%20Hotel%20Accommodation%20for%20the%20QMS-ISO.pdf\">Supply and Delivery of Food, Venue &amp; Hotel Accommodation for the QMS-ISO<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-336%20Supply%20and%20Delivery%20of%20Ready%20Made%20Office%20Table%20for%20the%20BRIDGES-AMBIANCE%20Project.pdf\">Supply and Delivery of Ready Made Office Table for the BRIDGES-AMBIANCE Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-412%20Supply%20and%20Delivery%20of%20AVR%20and%20UPS%20with%20built-in%20AVR%20for%20the%20College%20of%20Medicine.pdf\">Supply and Delivery of Fabricated Table Top Acrylic Barrier and Plain Hospital Bed with Mattress for the College of Medicine<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-412%20Supply%20and%20Delivery%20of%20AVR%20and%20UPS%20with%20built-in%20AVR%20for%20the%20College%20of%20Medicine.pdf\">Supply and Delivery of AVR and UPS with built-in AVR for the College of Medicine<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-337%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20Bridges-Ambiance%20Project.pdf\">Supply and Delivery of Various Materials and Equipment for the BRIDGES-AMBIANCE Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-325%20Supply,%20Delivery%20and%20Installation%20of%20Various%20Clear%20Glass%20with%20Analok%20for%20the%20CPERS.pdf\">Supply, Delivery and Installation of Various Clear Glass with Analok for the CPERS<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-324%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20CPERS.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the CPERS<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-406%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Administration.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-229%20Supply%20and%20Delivery%20of%20Booster%20Pump%20for%20the%20Moringa%20Production%20Project.pdf\">Supply and Delivery of Booster Pump for the Moringa Production Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-336%20Supply%20and%20Delivery%20of%20Ready%20Made%20Office%20Table%20for%20the%20BRIDGES-AMBIANCE%20Project.pdf\">Supply and Delivery of Ready Made Office Table for the BRIDGES-AMBIANCE Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-339%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20Bridges-Ambiance%20Project.pdf\">Supply and Delivery of Various Materials and Equipment for the Bridges-Ambiance Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-343%20Supply%20and%20Delivery%20of%20Multifunction%20Ink%20Tank%20Printer%20for%20the%20BRIDGES-AMBIANCE%20Project.pdf\">Supply and Delivery of Multifunction Ink Tank Printer for the BRIDGES-AMBIANCE Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-330%20Supply%20and%20Delivery%20of%20Duck%20Layer%20Pellet%20for%20the%20Itik%20Pinas%20Project.pdf\">Supply and Delivery of Duck Layer Pellet for the Itik Pinas Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-145-REBID%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Apparatus%20and%20Equipment%20for%20the%20Research%20Project%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Apparatus and Equipment for the Research Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-390%20Supply%20and%20Delivery%20of%20Various%20Electrical%20Supplies%20for%20the%20College%20of%20Engineering.pdf\">Supply and Delivery of Various Electrical Supplies for the College of Engineering<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-11-405%20Supply%20and%20Delivery%20of%20Various%20Plumbing%20Supplies%20and%20Materials%20for%20the%20Administration.pdf\">Supply and Delivery of Various Plumbing Supplies and Materials for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-143-REBID%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Apparatus%20and%20Equipment%20for%20the%20Research%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Apparatus and Equipment for the Research of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-344%20Supply%20and%20Delivery%20of%20Various%20Animal%20Feeds%20for%20the%20Zamopen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of Various Animal Feeds for the Zamopen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-352%20Supply%20and%20Delivery%20of%20Sprayer,%20Sprinkler%20and%20Weighing%20Scale%20for%20the%20Vegetable%20Production%20Project.pdf\">Supply and Delivery of Sprayer, Sprinkler and Weighing Scale for the Vegetable Production Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-387%20Supply%20and%20Delivery%20of%20Animal%20Feeds%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of Animal Feeds for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-375%20Supply%20and%20Delivery%20of%20Chronometer%20Timer%20for%20the%20Administration.pdf\">Supply and Delivery of Chronometer Timer for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-374%20Supply%20and%20Delivery%20of%20Various%20Battery%20for%20the%20Motorpool.pdf\">Supply and Delivery of Various Battery for the Motorpool<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-246%20Supply%20and%20Delivery%20of%20Microscope%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Microscope for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-372%20Supply%20and%20Delivery%20of%20Automatic%20Voltage%20Regulator%20for%20the%20College%20of%20Agriculture.pdf\">Supply and Delivery of Automatic Voltage Regulator for the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-389%20Supply%20and%20Delivery%20of%20Refrigeration%20for%20the%20VPAF.pdf\">Supply and Delivery of Refrigeration for the VPAF<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-385%20Supply%20and%20Delivery%20of%20Power%20Sprayer%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of Power Sprayer for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-373%20Supply%20and%20Delivery%20of%20Cartolina%20White%20for%20the%20TEC.pdf\">Supply and Delivery of Cartolina White for the TEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-371%20Supply%20and%20Delivery%20of%20Overhead%20Tank%20for%20the%20Vegetable%20Production%20Project.pdf\">Supply and Delivery of Overhead Tank for the Vegetable Production Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-368%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Administration.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-365%20Supply%20and%20Delivery%20of%20Various%20Painting%20Suppies%20and%20Materials%20for%20the%20Administration.pdf\">Supply and Delivery of Various Painting Suppies and Materials for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-360%20Supply%20and%20Delivery%20of%20Water%20Tank%20for%20the%20College%20of%20Medicine.pdf\">Supply and Delivery of Water Tank for the College of Medicine<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-323%20Supply%20and%20Delivery%20of%20Plastic%20Pallet%20and%20Portable%20Pressure%20Washer%20for%20the%20Itik%20Pinas%20Project.pdf\">Supply and Delivery of Plastic Pallet and Portable Pressure Washer for the Itik Pinas Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-301-REBID%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Physical%20Plant%20Office.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the Physical Plant Office<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-275-REBID%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Auxillary%20Services.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the Auxillary Services<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-350%20Supply%20and%20Delivery%20of%20Various%20Seeds%20for%20the%20Vegetable%20Production%20Project.pdf\">Supply and Delivery of Various Seeds for the Vegetable Production Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-351%20Supply%20and%20Delivery%20of%20Water%20Dispenser%20for%20the%20University%20Review%20and%20Evaluation%20Center.pdf\">Supply and Delivery of Water Dispenser for the University Review and Evaluation Center<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-355%20Supply%20and%20Delivery%20of%20Various%20Supplies%20and%20Materials%20for%20the%20RDEC.pdf\">Supply and Delivery of Various Supplies and Materials for the RDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-311%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20Itik%20Pinas%20Project.pdf\">Supply and Delivery of Various Materials and Equipment for the Itik Pinas Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-197%20Supply%20and%20Delivery%20of%20Portable%20Speaker%20with%20built-in%20Amplifier%20for%20the%20Itik%20Pinas%20Project.pdf\">Supply and Delivery of Portable Speaker with built-in Amplifier for the Itik Pinas Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-162-REBID%20Supply%20and%20Delivery%20of%20Various%20Electrical%20Supplies%20and%20Materials%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Various Electrical Supplies and Materials for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-329%20Supply%20and%20Delivery%20of%20Water%20Closet%20for%20the%20Administration%20of%20the%20University.pdf\">Supply and Delivery of Water Closet for the Administration of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-335%20Supply%20and%20Delivery%20of%20Razer%20Barbed%20Wire%20for%20the%20Administration%20of%20the%20University.pdf\">Supply and Delivery of Razer Barbed Wire for the Administration of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-149-REBID%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20Itik%20Pinas%20Project.pdf\">Supply and Delivery of Various Materials and Equipment for the Itik Pinas Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-143-REBID%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Apparatus%20and%20Equipment%20for%20the%20Research%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Apparatus and Equipment for the Research of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-187-REBID%20Supply%20and%20Delivery%20of%20Office%20Supplies%20and%20Materials%20for%20the%20NICER%20Project%203.pdf\">Supply and Delivery of Office Supplies and Materials for the NICER Project 3<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-154-REBID%20Supply%20and%20Delivery%20of%20Various%20Office%20Equipment%20for%20the%20%20for%20the%20Nicer%20Project.pdf\">Supply and Delivery of Various Office Equipment for the for the Nicer Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-317%20Supply%20and%20Delivery%20of%20Automotive%20Battery%20for%20the%20CSM.pdf\">SVP &#8211; PR-21-08-317 Supply and Delivery of Automotive Battery for the CSM<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-318%20Supply%20and%20Delivery%20of%20Triple%20Burner%20Stove%20with%20Complete%20Accessories%20for%20the%20Auxillary%20Services.pdf\">Supply and Delivery of Triple Burner Stove with Complete Accessories for the Auxillary Services<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-328%20Supply%20and%20Delivery%20of%20T-Shirt%20with%20Printing%20for%20the%20WESMAARRDEC.pdf\">Supply and Delivery of T-Shirt with Printing for the WESMAARRDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-153-REBID%20Supply%20and%20Delivery%20of%20Pulp%20&amp;%20Flour%20Grinder%20and%20Wood%20Chipper%20Machine%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Pulp &amp; Flour Grinder and Wood Chipper Machine for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-333%20Supply%20and%20Delivery%20of%20Hotel%20Accommodation%20for%20the%20QMS-ISO%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Apparatus, Equipment and Chemicals for the NICER Project 1<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-216-REBID%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Seeds%20for%20the%20Tissue%20Culture%20Project.pdf\">Supply and Delivery of Various Agricultural Seeds for the Tissue Culture Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-09-333%20Supply%20and%20Delivery%20of%20Hotel%20Accommodation%20for%20the%20QMS-ISO%20of%20the%20University.pdf\">SVP &#8211; PR-21-09-333 Supply and Delivery of Hotel Accommodation for the QMS-ISO of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-244%20Supply%20and%20Delivery%20of%20Electric%20Water%20Pump%20with%20Pressure%20Tank%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Electric Water Pump with Pressure Tank for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-313%20Supply,%20Delivery%20and%20Installation%20of%20Various%20Clear%20Glass%20for%20the%20Physical%20Plant%20Office.pdf\">Supply, Delivery and Installation of Various Clear Glass for the Physical Plant Office<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-295%20Supply%20and%20Delivery%20of%20Back%20Pack%20for%20the%20External%20Studies%20Unit%20of%20the%20Univversity.pdf\">Supply and Delivery of Back Pack for the External Studies Unit of the Univversity<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-308%20Supply%20and%20Delivery%20of%20Various%20Electrical%20Supplies%20and%20Materials%20for%20the%20College%20of%20Engineering.pdf\">Supply and Delivery of Various Electrical Supplies and Materials for the College of Engineering<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-301%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Physical%20Plant%20Office.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the Physical Plant Office<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-302%20Supply%20and%20Delivery%20of%20Token%20and%20Plaque%20for%20the%20University.pdf\">Supply and Delivery of Token and Plaque for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-221%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Administration%20of%20the%20University.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the Administration of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-248%20Supply%20and%20Delivery%20of%20Airconditioner%20Unit%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Airconditioner Unit for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-219%20Supply%20and%20Delivery%20of%20Multi-Tilling%20Machine%20for%20the%20Tissue%20Culture%20Project.pdf\">Supply and Delivery of Multi-Tilling Machine for the Tissue Culture Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-294%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Supplies%20and%20Medicines%20for%20the%20Zampen%20Native%20Chicken.pdf\">Supply and Delivery of Various Agricultural Supplies and Medicines for the Zampen Native Chicken<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-145%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Apparatus%20and%20Equipment%20for%20the%20Research%20Project%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Apparatus and Equipment for the Research Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-144%20Supply%20and%20Delivery%20of%20Various%20Chemicals%20for%20the%20Research%20Project%20of%20the%20University.pdf\">Supply and Delivery of Various Chemicals for the Research Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-107%20Supply%20and%20Delivery%20of%20Professional%20Analog%20Audio%20Mixer%20and%20Wireless%20Microphone%20System%20for%20the%20University.pdf\">Supply and Delivery of Professional Analog Audio Mixer and Wireless Microphone System for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-252%20Supply%20and%20Delivery%20of%20Lakatan%20Meristem%20for%20the%20Tissue%20Culture%20Project%20of%20the%20University.pdf\">Supply and Delivery of Lakatan Meristem for the Tissue Culture Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-309%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Physical%20Plant%20Office.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the Physical Plant Office<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-192%20Supply%20and%20Delivery%20of%20Moisture%20Analyzer,%20Centrifuge%20benchtop%20and%20Water%20Bath%20for%20the%20NICER%20Project%203.pdf\">Supply and Delivery of Moisture Analyzer, Centrifuge benchtop and Water Bath for the NICER Project 3<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-08-316%20Supply%20and%20Delivery%20of%20Various%20Plumbing%20Supplies%20and%20Materials%20for%20the%20Administration.pdf\">PR-21-08-316 Supply and Delivery of Various Plumbing Supplies and Materials for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-288%20Supply%20and%20Delivery%20of%20Book%20Paper%20and%20UPS%20with%20built-in%20AVR%20for%20the%20University%20Press.pdf\">PR-21-07-288 Supply and Delivery of Book Paper and UPS with built-in AVR for the University Press<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-153%20Supply%20and%20Delivery%20of%20Pulp%20&amp;%20Flour%20Grinder%20and%20Wood%20Chipper%20Machine%20for%20the%20NICER%20Project.pdf\">PR-21-05-153 Supply and Delivery of Pulp &amp; Flour Grinder and Wood Chipper Machine for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-143%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Apparatus%20and%20Equipment%20for%20the%20Research%20of%20the%20University.pdf\">PR-21-05-143 Supply and Delivery of Various Laboratory Apparatus and Equipment for the Research of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-147%20Supply%20and%20Delivery%20of%20Multipurpose%20Plastic%20Crate%20for%20the%20Itik%20Project%20of%20the%20University.pdf\">PR-21-05-147 Supply and Delivery of Multipurpose Plastic Crate for the Itik Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-090%20Supply%20and%20Delivery%20of%20Two-Way%20Radio%20Alert%20Set%20for%20the%20College%20of%20Home%20Economics.pdf\">PR-21-03-090 Supply and Delivery of Two-Way Radio Alert Set for the College of Home Economics<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-183%20Supply%20and%20Delivery%20of%20Various%20Ingredients%20for%20the%20NICER%20Project%203.pdf\">PR-21-05-183 Supply and Delivery of Various Ingredients for the NICER Project 3<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-143%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Apparatus%20and%20Equipment%20for%20the%20Research%20of%20the%20University.pdf\">PR-21-05-143 Supply and Delivery of Various Laboratory Apparatus and Equipment for the Research of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-185%20Supply%20and%20Delivery%20of%20Various%20Kitchenware%20for%20the%20NICER%20Project%203.pdf\">PR-21-05-185 Supply and Delivery of Various Kitchenware for the NICER Project 3<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-215%20Supply%20and%20Delivery%20of%20Various%20Fertilizer%20and%20Insecticide%20for%20the%20Tissue%20Culture%20Project.pdf\">PR-21-06-215 Supply and Delivery of Various Fertilizer and Insecticide for the Tissue Culture Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-162%20Supply%20and%20Delivery%20of%20Various%20Electrical%20Supplies%20and%20Materials%20for%20the%20NICER%20Project.pdf\">PR-21-05-162 Supply and Delivery of Various Electrical Supplies and Materials for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-203%20Supply%20and%20Delivery%20of%20Various%20Equipment%20of%20the%20Zampen%20Native%20Chicken%20Project.pdf\">PR-21-06-203 Supply and Delivery of Various Equipment of the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-268%20Supply%20and%20Delivery%20of%20Various%20Kitchenware%20for%20the%20Auxillary%20Services.pdf\">PR-21-07-268 Supply and Delivery of Various Kitchenware for the Auxillary Services<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-172%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20NICER%20Project.pdf\">PR-21-05-172 Supply and Delivery of Various Hardware Supplies and Materials for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-236%20Supply%20and%20Delivery%20of%20Feed%20Mixer%20Machine%20and%20Incubator%20&amp;%20Hatcher%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">PR-21-06-236 Supply and Delivery of Feed Mixer Machine and Incubator &amp; Hatcher for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-275%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Auxillary%20Services.pdf\">PR-21-07-275 Supply and Delivery of Various Hardware Supplies and Materials for the Auxillary Services<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-234%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20Moringa%20Seedlings%20Production.pdf\">PR-21-06-234 Supply and Delivery of Various Materials and Equipment for the Moringa Seedlings Production<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-216%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Seeds%20for%20the%20Tissue%20Culture%20Project.pdf\">PR-21-06-216 Supply and Delivery of Various Agricultural Seeds for the Tissue Culture Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-174%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Materials%20and%20Medicines%20for%20the%20NICER%20Project.pdf\">PR-21-05-174 Supply and Delivery of Various Agricultural Materials and Medicines for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-187%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20NICER%20Project%203.pdf\">PR-21-05-187 Supply and Delivery of Various Office Supplies and Materials for the NICER Project 3<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-231%20Supply%20and%20Delivery%20of%20Plastic%20Water%20Tank%20for%20the%20Moringa%20Seedlings%20Production.pdf\">SVP &#8211; PR-21-06-231 Supply and Delivery of Plastic Water Tank for the Moringa Seedlings Production<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-225%20Supply%20and%20Delivery%20of%20Plastic%20Drum,%20Water%20Sprinkler,%20Pail%20with%20Cover,%20Knapsack%20Sprayer%20and%20Pressure%20Sprayer%20for%20the%20Moringa%20Seedlings%20Production.pdf\">SVP &#8211; PR-21-06-225 Supply and Delivery of Plastic Drum, Water Sprinkler, Pail with Cover, Knapsack Sprayer and Pressure Sprayer for the Moringa Seedlings Production<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-249%20Supply%20and%20Delivery%20of%20Cassava%20Grinder%20for%20the%20Nicer%20Project%20of%20the%20University.pdf\">SVP &#8211; PR-21-06-249 Supply and Delivery of Cassava Grinder for the Nicer Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-189%20Supply%20and%20Delivery%20of%20Office%20Table%20and%20Executive%20Chair%20for%20the%20Nicer%20Project%203%20of%20the%20University.pdf\">SVP &#8211; PR-21-05-189 Supply and Delivery of Office Table and Executive Chair for the Nicer Project 3 of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-228%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies,%20Materials%20and%20Equipment%20for%20the%20Moringa%20Seedlings%20Production.pdf\">SVP &#8211; PR-21-06-228 Supply and Delivery of Various Office Supplies, Materials and Equipment for the Moringa Seedlings Production<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-279%20Supply%20and%20Delivery%20of%20Metal%20Fabrication%20of%20Top%20Table%20with%20Lavatory%20for%20the%20Nicer%20Project%203.pdf\">SVP &#8211; PR-21-06-279 Supply and Delivery of Metal Fabrication of Top Table with Lavatory for the Nicer Project 3<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-274%20Supply%20and%20Delivery%20of%20Plaque,%20Tokens,%20Souvenir%20Mugs%20and%20Room%20Labels%20for%20the%20Office%20of%20the%20President%20of%20the%20University.pdf\">PR-21-07-274 Supply and Delivery of Plaque, Tokens, Souvenir Mugs and Room Labels for the Office of the President of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-283%20Supply%20and%20Delivery%20of%20Food%20with%20softdrinks%20for%20the%20Office%20of%20the%20President%20of%20the%20University.pdf\">PR-21-07-283 Supply and Delivery of Food with softdrinks for the Office of the President of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-284%20Supply%20and%20Delivery%20of%20Stage%20Decoration%20with%20Landscaping%20for%20the%20Inaguration%20and%20Fiesta%20of%20the%20University.pdf\">PR-21-07-284 Supply and Delivery of Stage Decoration with Landscaping for the Inaguration and Fiesta of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-285%20Supply%20and%20Delivery%20of%20Hotel%20Accommodation%20for%20the%20Office%20of%20the%20President%20of%20the%20University.pdf\">PR-21-07-285 Supply and Delivery of Hotel Accommodation for the Office of the President of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-193%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Supplies%20and%20Materials%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">PR-21-05-193 Supply and Delivery of Various Agricultural Supplies and Materials for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-149%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20Itik%20Pinas%20Project.pdf\">PR-21-05-149 Supply and Delivery of Various Materials and Equipment for the Itik Pinas Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-180%20Supply%20and%20Delivery%20of%20Distilled%20Water%20for%20the%20Research%20Project%20of%20CSM%20of%20the%20University.pdf\">PR-21-05-180 Supply and Delivery of Distilled Water for the Research Project of CSM of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-07-263%20Supply%20and%20Delivery%20of%20Various%20Painting%20Supplies%20and%20Materials%20for%20the%20College%20of%20Nursing.pdf\">PR-21-07-263 Supply and Delivery of Various Painting Supplies and Materials for the College of Nursing<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-148%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Itik%20Pinas%20Project%20of%20the%20college%20of%20Agriculture.pdf\">PR-21-05-148 Supply and Delivery of Various Office Supplies and Materials for the Itik Pinas Project of the college of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-198%20Supply%20and%20Delivery%20of%20Automotive%20Batery%20for%20the%20College%20of%20Agriculture.pdf\">PR-21-06-198 Supply and Delivery of Automotive Batery for the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-115%20Supply,%20Delivery,%20Installation%20and%20Commissioning%20of%20Aircon%20Motor%20Compressor%20for%20the%20Motorpool.pdf\">PR-21-03-115 Supply, Delivery, Installation and Commissioning of Aircon Motor Compressor for the Motorpool<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-154%20Supply%20and%20Delivery%20of%20Various%20Office%20Equipment%20for%20the%20%20for%20the%20Nicer%20Project.pdf\">PR-21-05-154 Supply and Delivery of Various Office Equipment for the for the Nicer Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-175%20Supply%20and%20Delivery%20of%20Inventory%20Sticker%20and%20Equipment%20Ledger%20Card%20for%20the%20PMO.pdf\">PR-21-05-175 Supply and Delivery of Inventory Sticker and Equipment Ledger Card for the PMO<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-151%20Supply%20and%20Delivery%20of%20Molasses,%20Effective%20Microorganism,%20Range%20Net%20and%20Polyethylene%20Bag%20for%20the%20Nicer%20Project.pdf\">PR-21-05-151 Supply and Delivery of Molasses, Effective Microorganism, Range Net and Polyethylene Bag for the Nicer Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-119%20Supply%20and%20Delivery%20of%20Various%20Chemicals%20for%20the%20CSM.pdf\">PR-21-03-119 Supply and Delivery of Various Chemicals for the CSM<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-128-REBID%20Supply%20and%20Delivery%20of%20Black%20Poly%20Pond%20Liner%20for%20the%20College%20of%20Agriculture.pdf\">PR-21-04-128-REBID Supply and Delivery of Black Poly Pond Liner for the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-147%20Supply%20and%20Delivery%20of%20Multipurpose%20Plastic%20Crate%20for%20the%20Itik%20Project%20of%20the%20University.pdf\">PR-21-05-147 Supply and Delivery of Multipurpose Plastic Crate for the Itik Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-156%20Supply%20and%20Delivery%20of%202-Burner%20Gas%20Stove%20with%20LPG%20Tank%20for%20the%20Nicer%20Project.pdf\">PR-21-05-156 Supply and Delivery of 2-Burner Gas Stove with LPG Tank for the Nicer Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-254%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Administration.pdf\">PR-21-06-254 Supply and Delivery of Various Hardware Supplies and Materials for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-255%20Supply%20and%20Delivery%20of%20Various%20Tiles%20for%20the%20Administration.pdf\">PR-21-06-255 Supply and Delivery of Various Tiles for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-256%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Administration.pdf\">PR-21-06-256 Supply and Delivery of Various Hardware Supplies and Materials for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-260%20Supply%20and%20Delivery%20of%20Fine%20Sand%20and%20Portland%20Cement%20for%20the%20Administration.pdf\">PR-21-06-260 Supply and Delivery of Fine Sand and Portland Cement for the Administration<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-156%20Supply%20and%20Delivery%20of%202-Burner%20Gas%20Stove%20with%20LPG%20Tank%20for%20the%20Nicer%20Project.pdf\">PR-21-05-156 Supply and Delivery of 2-Burner Gas Stove with LPG Tank for the Nicer Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-240%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Materials%20for%20the%20Conversion%20of%20Canteen%20No.%201,%202%20and%203%20into%20Faculty%20Lounge%20of%20the%20University.pdf\">PR-21-06-240 Supply and Delivery of Various Hardware Materials for the Conversion of Canteen No. 1, 2 and 3 into Faculty Lounge of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-06-239%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Conversion%20of%20Canteen%20No.%201,%202%20and%203%20into%20Faculty%20Lounge%20of%20the%20Universit.pdf\">PR-21-06-239 Supply and Delivery of Various Hardware Supplies and Materials for the Conversion of Canteen No. 1, 2 and 3 into Faculty Lounge of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-132%20Supply%20and%20Delivery%20of%20Goggle,%20N95%20%20Mask,%20Surgical%20Mask%20and%20Disposable%20Isolation%20Gown%20with%20Cap%20&amp;%20Snow%20Cover%20for%20the%20Dental%20Clinic.pdf\">PR-21-04-132 Supply and Delivery of Goggle, N95 Mask, Surgical Mask and Disposable Isolation Gown with Cap &amp; Snow Cover for the Dental Clinic<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-131%20Supply%20and%20Delivery%20of%20LED%20Street%20Light,%20Chronometry%20timer%20and%20Magnetic%20Swith%20for%20the%20University.pdf\">PR-21-04-131 Supply and Delivery of LED Street Light, Chronometry timer and Magnetic Swith for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-100%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20University.pdf\">PR-21-03-100 Supply and Delivery of Various Materials and Equipment for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-078%20Supply%20and%20Delivery%20of%20Handsfree%20Thermometer%20with%20Tripod%20and%20Alcohol%20Dispenser%20for%20the%20University.pdf\">PR-21-03-078 Supply and Delivery of Handsfree Thermometer with Tripod and Alcohol Dispenser for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-130%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Itik%20Project%20of%20the%20College%20of%20Agriculture.pdf\">PR-21-04-130 Supply and Delivery of Various Office Supplies and Materials for the Itik Project of the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-127%20Supply%20and%20Delivery%20of%20Various%20Welding%20Supplies,%20Materials%20and%20Equipment%20for%20the%20College%20of%20Agriculture.pdf\">PR-21-04-127 Supply and Delivery of Various Welding Supplies, Materials and Equipment for the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-106%20Supply%20and%20Delivery%20of%20Refrigerator%20and%20Induction%20Stove%20for%20the%20University.pdf\">PR-21-03-106 Supply and Delivery of Refrigerator and Induction Stove for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-125%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Supplies%20and%20Materials%20for%20the%20College%20of%20Agriculture.pdf\">PR-21-04-125 Supply and Delivery of Various Agricultural Supplies and Materials for the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-129%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Supplies%20and%20Materials%20for%20the%20Itik%20Project%20of%20the%20College%20of%20Agriculture.pdf\">PR-21-04-129 Supply and Delivery of Various Agricultural Supplies and Materials for the Itik Project of the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-110%20Supply%20and%20Delivery%20of%20Flash%20Drive%20and%20external%20Hard%20Drive%20for%20the%20CCE.pdf\">PR-21-03-110 Supply and Delivery of Flash Drive and external Hard Drive for the CCE<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-105%20Supply%20and%20Delivery%20of%205%20Seater%20L-Type%20Sofa%20Set%20for%20the%20College%20of%20Nursing.pdf\">PR-21-03-105 Supply and Delivery of 5 Seater L-Type Sofa Set for the College of Nursing<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-04-128%20Supply%20and%20Delivery%20of%20Black%20Poly%20Pond%20Liner%20for%20the%20College%20of%20Agriculture.pdf\">PR-21-04-128 Supply and Delivery of Black Poly Pond Liner for the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-02-049-REBID%20Supply%20and%20Delivery%20of%20Various%20Materials%20and%20Equipment%20for%20the%20Vegetable%20Production%20Project%20of%20the%20College%20of%20Agriculture%20of%20the%20University.pdf\">PR-21-02-049-REBID Supply and Delivery of Various Materials and Equipment for the Vegetable Production Project of the College of Agriculture of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-019-REBID%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20University.pdf\">PR-21-01-019-REBID Supply and Delivery of Various Hardware Supplies and Materials for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-033-REBID%20Supply%20and%20Delivery%20of%20Various%20Office%20Furniture%20and%20Fixtures%20for%20the%20University.pdf\">PR-21-01-033-REBID Supply and Delivery of Various Office Furniture and Fixtures for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-02-044%20Supply%20and%20Delivery%20of%20Various%20Solar%20Panel,%20Solar%20Inverter,%20Water%20and%20Submersible%20Pump%20for%20the%20Research%20Project%20of%20the%20CSm%20of%20the%20University.pdf\">PR-21-02-044 Supply and Delivery of Various Solar Panel, Solar Inverter, Water and Submersible Pump for the Research Project of the CSm of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-112%20Supply%20and%20Delivery%20of%20Sublimation%20Polo%20Shirt%20with%20Printing%20for%20the%20Scholarship%20of%20the%20University.pdf\">PR-21-03-112 Supply and Delivery of Sublimation Polo Shirt with Printing for the Scholarship of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-089%20Supply%20and%20Delivery%20of%20Circular%20Saw%20of%20the%20Administration%20of%20the%20University.pdf\">PR-21-03-089 Supply and Delivery of Circular Saw of the Administration of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-079%20Supply%20and%20Delivery%20of%20Various%20Standing%20Water%20Dispenser%20for%20the%20WESMAARRDEC.pdf\">PR-21-03-079 Supply and Delivery of Various Standing Water Dispenser for the WESMAARRDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-096%20Supply%20and%20Delivery%20of%20Various%20Hardware%20and%20Electrical%20Supplies%20and%20Materials%20for%20the%20CLA.pdf\">Supply and Delivery of Various Hardware and Electrical Supplies and Materials for the CLA<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-02-056%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20College%20of%20Agriculture.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the College of Agriculture<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-072%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Materials%20and%20Equipment%20for%20the%20College%20of%20Medicine.pdf\">Supply and Delivery of Various Laboratory Materials and Equipment for the College of Medicine<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-122%20Supply%20and%20Delivery%20of%20Food,%20Venue%20and%20Accommodation%20for%20the%20Research%20of%20the%20University.pdf\">Supply and Delivery of Food, Venue and Accommodation for the Research of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-075%20Supply%20and%20Delivery%20of%20Ethyl%20Alcohol%20for%20the%20Health%20Services%20of%20the%20University.pdf\">Supply and Delivery of Ethyl Alcohol for the Health Services of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-043-REBID%20Supply%20and%20Delivery%20of%20Collared%20Shirt%20with%20Printing%20for%20the%20GRRC%20of%20the%20University.pdf\">Supply and Delivery of Collared Shirt with Printing for the GRRC of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-015-REBID%20Supply%20and%20Delivery%20of%20Electric%20Jigsaw%20and%20Electric%20Hammer%20for%20the%20Administration%20Office%20and%20VPAF%20of%20the%20University.pdf\">PR-21-01-015-REBID Supply and Delivery of Electric Jigsaw and Electric Hammer for the Administration Office and VPAF of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-043%20Supply%20and%20Delivery%20of%20Collared%20Shirt%20with%20Printing%20for%20the%20GRRC%20of%20the%20University.pdf\">PR-21-01-043 Supply and Delivery of Collared Shirt with Printing for the GRRC of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-02-051%20Supply%20and%20Delivery%20of%20Hotel%20Accommodation%20in%20Davao%20City%20for%20the%20University.pdf\">SVP &#8211; PR-21-02-051 Supply and Delivery of Hotel Accommodation in Davao City for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-019%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20University.pdf\">PR-21-01-019 Supply and Delivery of Various Hardware Supplies and Materials for the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-006-REBID%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Zampen%20Native%20Chicken%20Project%20of%20the%20College%20of%20Agriculture%20of%20the%20University.pdf\">PR-21-01-006-REBID Supply and Delivery of Various Hardware Supplies and Materials for the Zampen Native Chicken Project of the College of Agriculture of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-02-055%20Supply%20and%20Delivery%20Removal%20and%20Dismantling%20of%20Unused%20VHF%20Antenna%20at%20Administration%20Building%20of%20the%20University.pdf\">SVP &#8211; PR-21-02-055 Supply and Delivery Removal and Dismantling of Unused VHF Antenna at Administration Building of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-015%20Supply%20and%20Delivery%20of%20Various%20Carpentry%20Tools%20and%20Equipment%20for%20the%20Administration%20Office%20and%20VPAF%20of%20the%20University.pdf\">PR-21-01-015 Supply and Delivery of Various Carpentry Tools and Equipment for the Administration Office and VPAF of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-026%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Physical%20Plant%20Office%20of%20the%20University.pdf\">PR-21-01-026 Supply and Delivery of Various Hardware Supplies and Materials for the Physical Plant Office of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-004%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Supplies%20and%20Materials%20for%20the%20Zampen%20Native%20Chicken%20Project%20of%20the%20University.pdf\">PR-21-01-004 Supply and Delivery of Various Agricultural Supplies and Materials for the Zampen Native Chicken Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-021%20Supply%20and%20Delivery%20of%20Various%20Aircon%20Spare%20Parts%20and%20Consumables%20for%20the%20PMO%20of%20the%20University.pdf\">PR-21-01-021 Supply and Delivery of Various Aircon Spare Parts and Consumables for the PMO of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-032%20Supply%20and%20Delivery%20Removal%20and%20Dismantling%20of%20Unused%20VHF%20Antenna%20at%20Administration%20Building%20of%20the%20University.pdf\">PR-21-01-032 Supply and Delivery Removal and Dismantling of Unused VHF Antenna at Administration Building of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-005%20Supply%20and%20Delivery%20of%202-in1%20Incubator%20and%20Hatcher%20for%20the%20Zampen%20Native%20Chicken%20of%20the%20College%20of%20Agriculture%20of%20the%20University.pdf\">PR-21-01-005 Supply and Delivery of 2-in1 Incubator and Hatcher for the Zampen Native Chicken of the College of Agriculture of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-007%20Supply%20and%20Delivery%20of%20Cartolina%20for%20the%20TEC.pdf\">PR-21-01-007 Supply and Delivery of Cartolina for the TEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-006%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Zampen%20Native%20Chicken%20Project%20of%20the%20College%20of%20Agriculture%20of%20the%20University.pdf\">PR-21-01-006 Supply and Delivery of Various Hardware Supplies and Materials for the Zampen Native Chicken Project of the College of Agriculture of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-037%20Supply%20and%20Delivery%20of%20Various%20Prepaid%20Load%20for%20the%20Scholarship%20Office%20and%20CHED%20Project%20of%20CSWCD.pdf\">PR-21-01-037 Supply and Delivery of Various Prepaid Load for the Scholarship Office and CHED Project of CSWCD<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-01-025%20Supply%20and%20Delivery%20of%20Various%20Construction%20Supplies%20and%20Materials%20for%20the%20Extension%20of%20Gate%201%20of%20the%20University.pdf\">PR-21-01-025 Supply and Delivery of Various Construction Supplies and Materials for the Extension of Gate 1 of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-20-08-187%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20Renovation%20of%20Existing%20Mushroom%20Facility%20at%20the%20College%20of%20Agriculture%20of%20the%20University.pdf\">PR-20-08-187 Supply and Delivery of Various Hardware Supplies and Materials for the Renovation of Existing Mushroom Facility at the College of Agriculture of the University<\/a><\/li>\n<\/ul>\n\n\n<ul>\n<li><strong>Shopping<\/strong><\/li>\n\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-11-435%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20RDEC.pdf\">Supply and Delivery of Various Office Supplies and Materials for the RDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-11-436%20Supply%20and%20Delivery%20of%20Various%20Hardware%20Supplies%20and%20Materials%20for%20the%20PPO.pdf\">Supply and Delivery of Various Hardware Supplies and Materials for the PPO<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-10-379%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Research%20Project.pdf\">Supply and Delivery of Various Office Supplies and Materials for the Research Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-10-376%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Research.pdf\">Supply and Delivery of Various Office Supplies and Materials for the Research<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-09-342%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20BRIDGES-AMBIANCE%20Project.pdf\">Supply and Delivery of Various Office Supplies and Materials for the BRIDGES-AMBIANCE Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-11-398%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20QMS%20ISO.pdf\">Supply and Delivery of Various Office Supplies and Materials for the QMS ISO<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-10-395%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of Various Office Supplies and Materials for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-10-394%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20RDEC.pdf\">Supply and Delivery of Various Office Supplies and Materials for the RDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-10-381%20Supply%20and%20Delivery%20of%20Various%20Ink%20Toner%20and%20Cartridge%20for%20the%20University%20Board%20Secretary.pdf\">Supply and Delivery of Various Ink Toner and Cartridge for the University Board Secretary<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-06-204%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Zampen%20Native%20Chicken%20Project.pdf\">Supply and Delivery of Various Office Supplies and Materials for the Zampen Native Chicken Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-10-354%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Various Office Supplies and Materials for the NICER Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-06-202-REBID%20Supply%20and%20Delivery%20of%20Various%20Ingredients%20for%20the%20Auxillary%20Services.pdf\">SHOPPING &#8211; PR-21-06-202-REBID Supply and Delivery of Various Ingredients for the Auxillary Services<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-06-261%20Supply%20and%20Delivery%20of%20Various%20Supplies%20and%20Materials%20for%20the%20WESMAARRDEC.pdf\">PR-21-06-261 Supply and Delivery of Various Supplies and Materials for the WESMAARRDEC<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-06-199%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20GRRC%20of%20the%20University.pdf\">PR-21-06-199 Supply and Delivery of Various Office Supplies and Materials for the GRRC of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-05-146%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Research%20Project%20of%20the%20University.pdf\">PR-21-05-146 Supply and Delivery of Various Office Supplies and Materials for the Research Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-157%20Supply%20and%20Delivery%20of%20Various%20Offi8ce%20Supplies%20and%20Materials%20for%20the%20Nicer%20Project%20.pdf\">PR-21-05-157 Supply and Delivery of Various Office Supplies and Materials for the Nicer Project<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-05-171Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20CHED%20Project%20of%20CSWCD.pdf\">PR-21-05-171 Supply and Delivery of Various Office Supplies and Materials for the CHED Project of CSWCD<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-03-088%20Supply%20and%20Delivery%20of%20Webcam,%20External%20Hard%20Drive,%20Powerbank%20and%20Earphone%20with%20Mic%20Controller%20for%20the%20CPERS%20.pdf\">PR-21-03-088 Supply and Delivery of Webcam, External Hard Drive, Powerbank and Earphone with Mic Controller for the CPERS<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SVP%20-%20PR-21-03-111%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20CCE.pdf\">PR-21-03-111 Supply and Delivery of Various Office Supplies and Materials for the CCE<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-01-028-REBID%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20CHED%20Project%20of%20the%20University.pdf\">Supply and Delivery of Various Office Supplies and Materials for the CHED Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-02-048%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20Vegetable%20Production%20Project%20of%20the%20University.pdf\">PR-21-02-048 Supply and Delivery of Various Office Supplies and Materials for the Vegetable Production Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-02-042%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20VP-RESEL%20of%20the%20University.pdf\">PR-21-02-042 Supply and Delivery of Various Office Supplies and Materials for the VP-RESEL of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-02-047%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20QMO-ISO%20of%20the%20University.pdf\">PR-21-02-047 Supply and Delivery of Various Office Supplies and Materials for the QMO-ISO of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-01-028%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20CHED%20Project%20of%20the%20University.pdf\">PR-21-01-028 Supply and Delivery of Various Office Supplies and Materials for the CHED Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-01-008%20Supply%20and%20Delivery%20of%20Various%20Supplies%20and%20Material%20for%20the%20Zampen%20Native%20Chicken%20Project%20of%20the%20University.pdf\">PR-21-01-008 Supply and Delivery of Various Supplies and Material for the Zampen Native Chicken Project of the University<\/a><\/li>\n \n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/SHOPPING%20-%20PR-21-01-001%20Supply%20and%20Delivery%20of%20Ethyl%20Alcohol%20for%20the%20Health%20Services%20of%20the%20University.pdf\">PR-21-01-001 Supply and Delivery of Ethyl Alcohol for the Health Services of the University<\/a><\/li>\n<\/ul>\n<!-- \/wp:list -->\n\n<ul>\n<li><strong>Public Bidding<\/strong><\/li>\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-10-353.pdf\">6th Ed PBDs_PR-21-10-353<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-11-401.pdf\">6th Ed PBDs_PR-21-11-401<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-03-117%20Supply%20and%20Delivery%20of%20Various%20Equipment%20for%20the%20University.pdf\">Supply and Delivery of Various Equipment for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-10-353%20Supply,%20%20Delivery,%20Training,%20Installation%20&amp;%20configuration%20of%20Fiber%20Optic%20Backbone%20Wireless%20Hotspot%20and%20Backhaul%20for%20the%20WMSU%20Campus.pdf\">Supply, Delivery, Training, Installation &amp; configuration of Fiber Optic Backbone Wireless Hotspot and Backhaul for the WMSU Campus<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-10-357%20Supply,%20Delivery%20and%20Installation%20of%20Local%20Network%20(LAN)%20for%20the%20University%20Registrar.pdf\">Supply, Delivery and Installation of Local Network (LAN) for the University Registrar<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-10-391%20Supply%20and%20Delivery%20of%20Computer%20Table%20with%20Chair%20for%20the%20College%20of%20Engineering.pdf\">Supply and Delivery of Computer Table with Chair for the College of Engineering<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-11-401%20Supply,%20Delivery%20and%20Installation%20of%20Solar%20Streetlight%20for%20the%20University.pdf\">Supply, Delivery and Installation of Solar Streetlight for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-06-213%20Supply%20and%20Delivery%20of%20Various%20Equipment%20for%20the%20Tissue%20Culture%20Project.pdf\">Supply and Delivery of Various Equipment for the Tissue Culture Project<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-05-163%20Supply%20and%20Delivery%20of%20Various%20Agricultural%20Materials%20and%20Equipment%20for%20the%20NICER%20Project.pdf\">Supply and Delivery of Various Agricultural Materials and Equipment for the NICER Project<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-05-177.pdf\">6th Ed PBDs_PR-21-05-177<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-06-262.pdf\">6th Ed PBDs_PR-21-06-262<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-06-208.pdf\">6th Ed PBDs_PR-21-06-208<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-06-200.pdf\">6th Ed PBDs_PR-21-06-200<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-012-REBID.pdf\">6th Ed PBDs_PR-21-01-012-REBID<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-003.pdf\">6th Edition PBDs_Proposed Covered Parking Area<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-003.pdf\">6th Edition PBDs_Proposed Repair &amp; Enhancement of Cashier &amp; Registrar&#8217;s Queueing Area<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-09-326.pdf\">6th Ed PBDs_PR-21-09-326<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-029.pdf\">6th Ed PBDs_PR-21-01-029<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-04-137.pdf\">6th Ed PBDs_PR-21-04-137<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PBDs%20for%20Design%20and%20Build%20of%20Proposed%20College%20of%20Medicine%20Bldg.pdf\">PBDs for Design and Build of Proposed College of Medicine Bldg<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-062-REBID%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Equipment%20for%20the%20College%20of%20Engineering%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Equipment for the College of Engineering of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-062-REBID.pdf\">6th Ed PBDs_PR-21-02-062-REBID<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-011-REBID%20Supply%20and%20Delivery%20of%20Various%20Equipment%20for%20the%20College%20of%20Forestry.pdf\">Supply and Delivery of Various Equipment for the College of Forestry<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-011-REBID.pdf\">6th Ed PBDs_PR-21-01-011-REBID<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-07-280-REBID.pdf\">6th Ed PBDs_PR-21-07-280-REBID (Supply and Delivery of Educational English Language Software Subscription for the LDRC<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-05-141.pdf\">Philippine Bidding Document for PR-21-05-141<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-07-280.pdf\">6th Ed PBDs_PR-21-07-280<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-05-186.pdf\">6th Ed PBDs_PR-21-05-186<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-05-192.pdf\">6th Ed PBDs_PR-21-05-192<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-05-186%20Supply%20and%20Delivery%20of%20Various%20IT%20Equipment%20for%20the%20Nicer%20Project%203%20of%20the%20University.pdf\">PB &#8211; PR-21-05-186 Supply and Delivery of Various IT Equipment for the Nicer Project 3 of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-05-192%20Supply%20and%20Delivery%20of%20Moisture%20Analyzer,%20Centrifuge%20Benchtop%20and%20Water%20Bath%20for%20the%20Nicer%20Project%203%20for%20the%20University.pdf\">PB &#8211; PR-21-05-192 Supply and Delivery of Moisture Analyzer, Centrifuge Benchtop and Water Bath for the Nicer Project 3 for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-07-280%20Supply%20and%20Delivery%20of%20Educational%20English%20Language%20Software%20Subscription%20for%20the%20LDRC.pdf\">PB &#8211; PR-21-07-280 Supply and Delivery of Educational English Language Software Subscription for the LDRC<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-06-209.pdf\">Philippine Bidding Document for PR-21-06-209<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-04-133.pdf\">Philippine Bidding Document for PR-21-04-133<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-011.pdf\">6th Ed PBDs_PR-21-01-011<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-034.pdf\">6th Ed PBDs_PR-21-01-034<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-082.pdf\">6th Ed PBDs_PR-21-03-082<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-103.pdf\">6th Ed PBDs_PR-21-03-103<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-101.pdf\">6th Ed PBDs_PR-21-03-101<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-118.pdf\">6th Ed PBDs_PR-21-03-118<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-091.pdf\">6th Ed PBDs_PR-21-03-091<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-094.pdf\">6th Ed PBDs_PR-21-03-094<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-071-REBID%20Supply%20and%20Delivery%20of%20Medical%20Equipment%20for%20the%20University.pdf\">PR-21-02-071-REBID Supply and Delivery of Medical Equipment for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-057-REBID%20Supply%20and%20Delivery%20of%20UHF%20Card%20for%20RFID%20for%20the%20University%20Press.pdf\">PB &#8211; PR-21-02-057-REBID Supply and Delivery of UHF Card for RFID for the University Press<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-058-REBID%20Supply%20and%20Delivery%20of%20ID%20Sling%20with%20Holder%20for%20the%20University%20Press.pdf\">PR-21-02-058-REBID Supply and Delivery of ID Sling with Holder for the University Press<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-03-098%20Supply%20and%20Delivery%20of%20Various%20Office%20Materials%20and%20Equipment%20for%20the%20University.pdf\">PB &#8211; PR-21-03-098 Supply and Delivery of Various Office Materials and Equipment for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-069%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20WESMAARRDEC.pdf\">PR-21-02-069 Supply and Delivery of Various Office Supplies and Materials for the WESMAARRDEC<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-057.pdf\">6th Ed PBDs_PR-21-02-057<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-058.pdf\">6th Ed PBDs_PR-21-02-058<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-071.pdf\">6th Ed PBDs_PR-21-02-071<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-069.pdf\">6th Ed PBDs_PR-21-02-069<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-098.pdf\">6th Ed PBDs_PR-21-03-098<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-031%20Supply%20and%20Delivery%20of%20Various%20IT%20Equipment%20for%20the%20CoE%20of%20the%20University.pdf\">Supply and Delivery of Various IT Equipment for the CoE of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-061%20Supply,%20Delivery%20and%20Installation%20of%20Various%20Engineering%20Simulation%20and%20Automation%20Laboratory%20Equipment%20for%20the%20CoE%20of%20the%20University.pdf\">Supply, Delivery and Installation of Various Engineering Simulation and Automation Laboratory Equipment for the CoE of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-012.pdf\">6th Ed PBDs_PR-21-01-012<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-062.pdf\">6th Ed PBDs_PR-21-02-062<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-061.pdf\">6th Ed PBDs_PR-21-02-061<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-012%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Equipment%20for%20the%20CSM%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Equipment for the CSM of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-062%20Supply%20and%20Delivery%20of%20Various%20Laboratory%20Equipment%20for%20the%20College%20of%20Engineering%20of%20the%20University.pdf\">Supply and Delivery of Various Laboratory Equipment for the College of Engineering of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-067.pdf\">6th Ed PBDs_PR-21-02-067<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-02-064.pdf\">6th Ed PBDs_PR-21-02-064<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-064%20Supply%20and%20Delivery%20of%20Desktop%20Computer,%20Managed%20Switch%20and%20Android%20TV%20for%20the%20University.pdf\">PR-21-02-064 Supply and Delivery of Desktop Computer, Managed Switch and Android TV for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-067%20Supply%20and%20Delivery%20of%20Various%20Office%20Supplies%20and%20Materials%20for%20the%20University.pdf\">PR-21-02-067 Supply and Delivery of Various Office Supplies and Materials for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-057%20Supply%20and%20Delivery%20of%20UHF%20Card%20for%20RFID%20for%20the%20University%20Press.pdf\">PR-21-02-057 Supply and Delivery of UHF Card for RFID for the University Press<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-058%20Supply%20and%20Delivery%20of%20ID%20Sling%20with%20Holder%20for%20the%20University%20Press.pdf\">PR-21-02-058 Supply and Delivery of ID Sling with Holder for the University Press<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-071%20Supply%20and%20Delivery%20of%20Medical%20Equipment%20for%20the%20University.pdf\">PR-21-02-071 Supply and Delivery of Medical Equipment for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-03-073%20Supply%20and%20Delivery%20of%20Laptop%20and%20Desktop%20Computer%20for%20the%20College%20of%20Medicine%20of%20the%20University.pdf\">PR-21-03-073 Supply and Delivery of Laptop and Desktop Computer for the College of Medicine of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-03-074%20Supply%20and%20Delivery%20of%20Various%20Electrical%20Materials%20and%20Equipment%20for%20the%20University.pdf\">PR-21-03-074 Supply and Delivery of Various Electrical Materials and Equipment for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-033%20Supply%20and%20Delivery%20of%20Various%20Office%20Furniture%20and%20Fixtures%20for%20the%20University.pdf\">PR-21-01-033 Supply and Delivery of Various Office Furniture and Fixtures for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-030%20Supply%20and%20Delivery%20of%20Security%20Paper%20for%20TOR%20and%20Diploma%20for%20the%20University%20Registrar\">PB &#8211; PR-21-01-030 Supply and Delivery of Security Paper for TOR and Diploma for the University Registrar&#8217;s Office<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-018%20Supply%20and%20Delivery%20of%20Various%20Tables%20and%20Chairs%20for%20the%20University.pdf\">PR-21-01-018 Supply and Delivery of Various Tables and Chairs for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-017%20Supply%20and%20Delivery%20of%20Various%20IT%20Equipment%20and%20Accessories%20for%20Various%20Offices%20of%20the%20University.pdf\">PR-21-01-017 Supply and Delivery of Various IT Equipment and Accessories for Various Offices of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-02-053%20Supply%20and%20Delivery%20of%20Tower%20and%20Rackmount%20Server%20for%20the%20University.pdf\">PB &#8211; PR-21-02-053 Supply and Delivery of Tower and Rackmount Server for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-033.pdf\">6th Ed PBDs_PR-21-01-033<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-030.pdf\">6th Ed PBDs_PR-21-01-030<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-018.pdf\">6th Ed PBDs_PR-21-01-018<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Edition%20PBDs_PR-21-01-020.pdf\">6th Edition PBDs_PR-21-01-020<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-003%20Supply%20and%20Delivery%20of%20Laptop%20for%20the%20RDEC.pdf\">PR-21-01-003 Supply and Delivery of Laptop for the RDEC<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-010%20Supply%20and%20Delivery%20of%20Various%20Office%20Appliances%20for%20the%20University.pdf\">PR-21-01-010 Supply and Delivery of Various Office Appliances for the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-022%20Supply%20and%20Delivery%20of%20LCD%20Projector%20and%20Notebook%20for%20the%20College%20of%20Forestry.pdf\">PR-21-01-022 Supply and Delivery of LCD Projector and Notebook for the College of Forestry<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/PB%20-%20PR-21-01-024%20Supply%20and%20Delivery%20of%20Water%20Dispenser%20for%20Various%20Offices%20of%20the%20University.pdf\">PR-21-01-024 Supply and Delivery of Water Dispenser for Various Offices of the University<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-003.pdf\">6th Ed PBDs_PR-21-01-003<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-010.pdf\">6th Ed PBDs_PR-21-01-010<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-022.pdf\">6th Ed PBDs_PR-21-01-022<\/a><\/li>\n<!-- \/wp:list-item --> <!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-01-024.pdf\">6th Ed PBDs_PR-21-01-024<\/a><\/li>\n<!-- \/wp:list-item --><\/ul>\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\">Bid Bulletin:<\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20solar.pdf\">Supply, Delivery and Installation of Solar Streetlight for the University<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20PR-21-06-200.pdf\">Bid Bulletin PR-21-06-200<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/bid%20bulletin.pdf\">PR-21-03-091<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/6th%20Ed%20PBDs_PR-21-03-091.pdf\">PR-21-03-091<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/bid%20bulletin%20pr-21-03-094-1.pdf\">PR-21-03-094<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20Retiling.pdf\">Proposed Elevation of Floor and Retiling of Student Lobby and Office of the Student Affairs<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20CR%20Gym.pdf\">Proposed Renovation of Male and Female Comfort Rooms in WMSU Gymnasium<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20CR%20CTE.pdf\">Proposed Renovation of Male and Female Comfort Rooms in CTE Building<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20Guidance.pdf\">Repair and Renovation of Guidance Counselling Center<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20student%20center.pdf\">Proposed Conversion of University Comfort Room to Student Center Building<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20PR-21-02-062.pdf\">Supply and Delivery of Various Laboratory Equipment for the College of Engineering of the University<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin%20-%20PR-21-02-061.pdf\">Supply, Delivery and Installation of Various Engineering Simulation and Automation Laboratory Equipment for the CoE of the University<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin-%20PR-%2021-01-012%20final.pdf\">Supply and Delivery of Various Laboratory Equipment for the CSM of the University<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin-%20PR-%2021-01-031.pdf\">Supply and Delivery of Various IT Equipment for the CoE of the University<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin-%20PR-%2021-02-064.pdf\">Supply and Delivery of Desktop Computer, Managed Switch and Android TV for the University<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin-%20PR-%2021-02-067.pdf\">Supply and Delivery of Various Office Supplies and Materials for the University<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin-%20PR-21-01-018.pdf\">Bid Bulletin- PR-21-01-018<\/a><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Bid%20Bulletin-%20PR-21-02-053.pdf\">Bid Bulletin- PR-21-02-053<\/a><\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\">Notice of Awards:<\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>Public Bidding<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list --><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Small Value Procurement<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list --><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Shopping<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list --><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Direct Contracting<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list --><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Repeat Order<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list --><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Emergency Cases<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list --><\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\">Contracts:<\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\">Notices to Proceed and Commence Work:<\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li>None<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\">Resolutions:<\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul><!-- wp:list-item -->\n<li><a href=\"http:\/\/58.71.15.10\/bac\/2017\/Minutes%20of%20Pre-Bid%20Conference%20Feb%2024.pdf\">Minutes of Pre-Bid Conference Feb 24<\/a><\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->","protected":false},"excerpt":{"rendered":"<p>Invitations to Bid: Small Value Shopping Public Bidding 6th Ed PBDs_PR-21-10-353 6th Ed PBDs_PR-21-11-401 Supply and Delivery of Various Equipment for the University Supply, Delivery, Training, Installation &amp; configuration of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=\/wp\/v2\/pages\/1945"}],"collection":[{"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1945"}],"version-history":[{"count":2,"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=\/wp\/v2\/pages\/1945\/revisions"}],"predecessor-version":[{"id":1976,"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=\/wp\/v2\/pages\/1945\/revisions\/1976"}],"wp:attachment":[{"href":"https:\/\/wmsu.edu.ph\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}